The different methods of demolition are as below.
Roof demolition sequence.
Inadequate demolition sequence common demolition submittal mistakes.
Building materials not indicated on the plan and sections.
Intent of demolition is to return building to basic core and shell with a level floor.
If exists remove sheet applied tinting from all existing doors and windows.
In general the following sequence shall apply.
Among other concerns they consider the area where the building is located the primary building materials the purpose of the demolition and how to dispose of the debris demolition methods can range from one devastating blast to careful piece by piece dismantling but in a crowded urban.
In case of demolition for the roof slab.
And the method of demolition to be adopted.
The presence of lift machines and watertanks at high level must be demolished in top down sequence to the main roof level.
4 2 2 demolition sequence 45 4 2 3 cantilevered structures and balconies 45 4 2 4 exterior walls beams and columns 48 4 2 5 floor slabs 57 4 2 6 interior beams 60 4 2 7 interior columns 60 4 3 top down by machines 60 4 3 1 general 60 4 3 2 demolition sequence 63 4 3 3 cantilevered canopies and balconies 64.
Detailed sequence of demolishing structural members.
Location and type of adjoining roof protection to be provided.
The major sequences of construction are marking excavation concreting brick masonry roof laying flooring and finishing.
Developers and demolition experts look at several factors when deciding how to demolish a building.
Contents sequences of work in building construction1.
1 utilities disconnection electricity plumbing water lines drainage conections etc.
A plan showing the procedure for the demolition of the building.
The demolition sequence will depend on things like the type of construction location and demolition methods selected.
The sequence of work to be followed in the construction of a building is the at most important procedures of construction.
And location and type of adjoining yard protection to be provided including controlled access zones.
It must be ensured to initiate demolition from the center mid span and then work outwards towards the supporting beams of frame structure.
2 all cantilevered structures canopies verandahs and features attached to the external walls shall first be demolished prior to demolition of main building and its internal structures on each floor 3 when demolishing the roof structure all lift machine rooms and watertanks at high level shall be demolished in top down sequence to the main roof level.
A plan showing all precautionary measures for the protection of the public including hoardings covered walkways catch platforms catch fans scaffolding protective screens and.